Electric power supply from 0.4 kV voltage power network, also including 0.4 kV transformer buses:
|
TARIFF DESCRIPTION |
MEASUREMENT UNIT |
Plan I
TARIFF (EXCLUDING VAT) |
Plan II
TARIFF (EXCLUDING VAT) |
Plan III
TARIFF (EXCLUDING VAT) |
|
1. Binary tariff consisting of power component and non-differentiated energy component:
|
||||
|
1.1. Power component*
|
Lt/kW/month
|
1,56
|
5,36
|
10,36
|
|
1.2. Non-differentiated energy component
|
ct/kWh
|
36,7
|
32,2
|
29,5
|
|
2. Binary tariff consisting of power component and double time-zone energy component:
|
||||
|
2.1. Power component*
|
Lt/kW/month
|
1,56
|
5,36
|
10,36
|
|
2.2. Day-time tariff
|
ct/kWh
|
39,3
|
34,4
|
31,2
|
|
2.3. Night-time, Saturday and Sunday tariff
|
ct/kWh
|
29,5
|
26,5
|
24,4
|
|
3. Binary tariff consisting of power component and energy component differentiated according to time intervals:
|
||||
|
3.1. Power component*
|
Lt/W/month k
|
1,56
|
5,36
|
10,36
|
|
3.2. Minimum loads
|
ct/kWh
|
30,9
|
27,5
|
25,3
|
|
3.3. Average loads
|
ct/kWh
|
35,1
|
30,7
|
28,1
|
|
3.4. Maximum loads
|
ct/kWh
|
44,3
|
39,0
|
35,7
|
|
3.5. On holidays and week-ends
|
ct/kWh
|
30,9
|
27,5
|
25,3
|
* Price of one kW month allowed to be used by the user.
Electric power supply from less than 110 kV, but not less than 6 kV voltage power network:
|
TARIFF DESCRIPTION |
MEASUREMENT UNIT |
Plan I
TARIFF (EXCLUDING VAT) |
Plan II
TARIFF (EXCLUDING VAT) |
Plan III
TARIFF (EXCLUDING VAT) |
|
1. Binary tariff consisting of power component and non-differentiated energy component:
|
||||
|
1.1. Power component*
|
Lt/kW/month
|
1,28
|
4,34
|
8,72
|
|
1.2. Non-differentiated energy component
|
ct/kWh
|
30,4
|
28,9
|
27,6
|
|
2. Binary tariff consisting of power component and double time-zone energy component:
|
||||
|
2.1. Power component*
|
Lt/kW/month
|
1,28
|
4,34
|
8,72
|
|
2.2. Day-time tariff
|
ct/kWh
|
31,6
|
30,9
|
29,1
|
|
2.3. Night-time, Saturday and Sunday tariff
|
ct/kWh
|
26,0
|
25,0
|
23,9
|
|
3. Binary tariff consisting of power component and energy component differentiated according to time intervals:
|
||||
|
3.1. Power component*
|
Lt/W/month k
|
1,28
|
4,34
|
8,72
|
|
3.2. Minimum loads
|
ct/kWh
|
26,0
|
25,0
|
23,9
|
|
3.3. Average loads
|
ct/kWh
|
29,1
|
27,6
|
26,3
|
|
3.4. Maximum loads
|
ct/kWh
|
36,6
|
34,9
|
33,3
|
|
3.5. On holidays and week-ends
|
ct/kWh
|
26,0
|
25,0
|
23,9
|
* Price of one kW month allowed to be used by the user.
Two time zones component of rates are as follows:
• Full-time rate - applicable from 7 a.m. to 11 p.m.
• Night, Saturday and Sunday rate - applicable from 11 p.m. to 7 am. and on Saturdays and Sundays all day.
Energy components, differentiated by time intervals, rates are as follows:
• maximum load interval rate – on October, November, December, January, February and March - from 8 a.m. to 11 a.m. and from 6 p.m. to 8 p.m., on April and September - 9 a.m. to 12 a.m. and from 7 p.m. to 9 p.m., on May, June , July and August - from 9 am to 12 am.;
• minimum loading interval rate - from 11 p.m. to 7 a.m.;
• holidays and rest days intervals are: Saturdays and Sundays, except for minimal load time ranges, as well as January 1, February 16, March 11, May 1, June 24, July 6, August 15, November 1, December 25 and December 26, excluding minimum load of time;
• the average load time interval rate - the rest of the time, not included in the maximum load, minimum load and holidays and weekend time intervals.
The specified time - Greenwich Time plus 2 hours, and does not change during establishment of summer and winter time.